Dark Light
NDAA FY17 has welcome news for small business owners who’ve complained about LPTA contracts.
Red easy vector illustration isolated paper bubble banner lowest price. This element is well adapted for web design.
© olly – Fotolia.com

Contractors have complained for awhile about the government’s overuse of lowest-price, technically acceptable (LPTA) contracts. NDAA FY17 severely limits the use of LPTA evaluations in DoD procurements.

To use an LPTA methodology, the following criteria must now be met:

  • DoD is able to comprehensively and clearly describe the minimum requirements expressed in terms of performance objectives, measures, and standards that will be used to determine the acceptability of offers;
  • DoD would receive little or no additional value from a proposal that exceeded the minimum technical or performance requirements set forth in the solicitation;
  • Little or no specialized judgment would be required by the contract selection authority to discern the differences between competitive proposals;
  • The source selection authority is confident the bids from the non-lowest price offeror(s) would not produce benefits of additional significant value or benefit to the Government;
  • The Contracting Officer includes written justification for use of the LPTA scheme in the contract file; and
  • DoD determines that the lowest price reflects full life-cycle costs, including costs for maintenance and support.

The NDAA also cautions against the use of LPTA for these three types of contracts:

  1. Contracts that predominately seek knowledge-based professional services (like information technology services, cybersecurity services, systems engineering and technical assistance services, advanced electronic testing, and audit or audit readiness services);
  2. Contracts seeking personal protective equipment; and
  3. Contracts for knowledge-based training or logistics services in contingency operations or other operations outside the U.S. (including Iraq and Afghanistan).

As a final tool to gauge compliance, Congress mandated that the DoD publish annual reports for the next four years that explain the rationale for all LPTA contracts exceeding $10 million.

Related Posts
css.php